Layout Navigator Case Study

LN-100

Layout Navigator LN-100

Reduce 50 % of Work Time

TOPCON

Civil Engineering

Total Stations

Layout Navigator LN-100

Reduce 50 % of Work Time

Complete staking out within 1 minute per point

Please introduce your company.

KRIANGKRAI SURVEYING CO., LTD. have been performing stakeout and topographic mapping for construction projects for more than twenty years. We started our business in Samut Prakan. Eleven well trained engineers and staff were lead by Mr. Kriangkrai Kamrai. Layout Navigator (LN) was our first purchased Topcon product.

Why did you choose the LN?

We are able to complete stakeout tasks much faster than before. When we stakeout for a basement with a LN, it takes less than 1 minute per point. In another word, we can complete staking out 50 points within an hour. 50 points are our average number a stakeout task for a jobsite. It used to take 2-3 hours when we used a conventional manual total station in that situation. With a conventional total station we needed to look into the telescope, measure and instruct each assistant to the stakeout point. We don’t need to do this processes anymore with a LN. In addition, LN’s accuracy is the same when compared to a 5″ total station which is fully acceptable for us. Our construction consultants also confirmed its accuracy at a jobsite after we completed a job. All in all, I’m very happy to use LN. I really enjoy doing my job using a LN and I don’t get tried easily nowadays. Before we purchase the LN, survey work was really tiring.

How do you use LN?

Before we go to a jobsite, first is to prepare coordinates from drawing file and convert it to a csv file on a PC. We send it to my smartphone by a messaging application and import it to the TopLayout; we don’t use a USB stick anymore. At jobsite, we perform stakeout with 3 people. I, as a surveyor, hold prism pole with a 360 degrees prism and a smartphone with the TopLayout. The other two assist me by staking piles and marking points by a paint spray. We don’t need any people at the LN anymore. All of us are at the prism side and simply following the point order showed on the TopLayout. In the past, I often need to switch with my survey assistant because looking into the telescope was tiring. I don’t mind if I have to walk around jobsite holding prism pole. It can be a good workout for me as well.

How much did productivity increased?

Work time has reduced to almost half compared to the conventional method with a manual total station. This is because we don’t need communication between instrument side and prism side through a walkie-talkie anymore. People at the prism side don’t have to wait for instructions from the surveyor to reach the correct position anymore. Also, when we use the LN, even my assistants with minimum surveying experience can complete stakeout tasks fast and accurately. When we used manual total station in the past, how fast they reach the correct position was highly depending on their skill.

What is your Return on Investment (ROI)?

We purchased the LN in December 2022, and the investment was paid off after just 2 months. The work time reduction contributed to our profit margin was a lot. I also tried one-man operation with the LN at 3 jobsites, and it reduced labor cost for assistants. The LN requires less labor, so if you are lacking manpower, a LN helps you a lot.

COMPANY: KRIANGKRAI SURVEYING CO., LTD.
TOPCON PRODUCT: LN-100, TopLayout
     

Subsidiary/Dealer: Topcon Positioning Asia (Thailand) Co., Ltd.
Project: Construction of food factory, office, residence
REGION: Nonthaburi, Thailand

Related Item

  • TOPCON

    Civil Engineering

    Total Stations

    LN-100/KRIANGKRAI SURVEYING CO., LTD./Apr.2023

    Reduce 50 % of Work Time

    TOPCON

    Civil Engineering

    Total Stations

  • TOPCON

    Surveying

    Civil Engineering

    Building Construction

    Total Stations

    LN-150/Simgeum-a Construction Co., Ltd./Jul.2022

    Batter Board Survey of Factory Site Using LN-150

    TOPCON

    Surveying

    Civil Engineering

    Building Construction

    Total Stations

  • SOKKIA

    Surveying

    Civil Engineering

    Total Stations

    Monitoring System

    Infrastructure Maintenance

    NET1AXⅡ/Changwon Gyeongryun Corporation/Jan.2018

    Example of using the structural safety management monitoring system (NET1AXII)

    SOKKIA

    Surveying

    Civil Engineering

    Total Stations

    Monitoring System

    Infrastructure Maintenance

News

Events

Start Date
2024/10/24
End Date
2024/10/27
Event Details

-Venue: KINTEX Exhibition Hall 1 4 and 5

-Date and time: 2024.10.24 (Thu)~27 (Sun)

                           2024.10.24 (Thursday)~25 (Friday) 10:00~17:00

                           2024.10.27 (Sat)~28 (Sun) 10:00~16:00

-Admission fee: General 10,000 won (taxed on-site registration without prior registration or free invitation)

Tag
  • Building Construction
  • Physical
  • Free
URL
/content/topcon-pa/kr/en/topics/2024/20240919.html
Target
_self
Start Date
2024/07/31
End Date
2024/08/03
Event Details

-Date and time: 2024.7.31 (Wednesday) ~ 8.3 (Sat) 10:00 to 18:00 (Entrance deadline is 17:30)

-Admission fee

General : KRW 20,000

middle and high school students, group (10 or more) : KRW 10,000

※Free admission is available for pre-registration

※Other free admission targets: preschoolers, those aged 65 or older, persons with disabilities, Civil servants, soldiers, and people of national merit (requires verifiable ID, verification card)

Tag
  • Physical
  • Free
  • BIM CIM
  • Surveying Design
  • Exhibition
URL
/content/topcon-pa/kr/en/events/2024/12345.html
Target
_self
Start Date
2024/06/11
End Date
2024/06/12
Event Details

Date and time: 2024.06.11 (Tue) ~ 2024.06.12 (Wed) 10:00-17:00

Venue: COEX Conference Room (south) 317-318

Host : Topcon Sokia Positioning Korea

Tag
  • Exhibition
  • Construction Ict
  • Physical
URL
/content/topcon-pa/kr/en/events/2024/0491.html
Target
_self

Contact us