- Start Date
- 2024/10/24
- End Date
- 2024/10/27
- Event Name
-
CONEX KOREA 2024
- Event Details
-
-Venue: KINTEX Exhibition Hall 1 4 and 5
-Date and time: 2024.10.24 (Thu)~27 (Sun)
2024.10.24 (Thursday)~25 (Friday) 10:00~17:00
2024.10.27 (Sat)~28 (Sun) 10:00~16:00
-Admission fee: General 10,000 won (taxed on-site registration without prior registration or free invitation)
- URL
- /content/topcon-pa/kr/en/topics/2024/20240919.html
- Target
- _self
Layout-Navigator excavator Case study
3D-MG LPS Excavator X-M3x LN
"Layout-Navigator Excavator" perfectly suits for the construction in maountain area!
The ideal ICT construction system that we finally came across
Takashiba Construction Co., Ltd. in Fukushima Prefecture is a construction company that focuses on construction work in mountain areas.
We heard that "Layout-Navigator Excavator" was introduced, and we had an interview with Mr.Tsutomu Owada, the representative director, and Mr. Yasumichi Nitta, who is actually using it in the construction sites.
Please tell us how you introduced "Layout-Navigator Excavator".
President Owada: We often work on construction in mountain areas, and most of the sites are difficult to capture GNSS. That's why we have been investing in total stations and layout navigation systems and considering the introduction of a total station excavator system, but we had deferred a decision on purchase of the system because it was expensive. When I was looking for an inexpensive system, "Layout-Navigator Excavator" was introduced. I knew how fast the layout navigation system would respond, so I felt that this is the timing, and I thought, "Let's purchase it right away!"
Did you participate in any test drive events?
President Owada: I didn't participate at all. I made purchase decision with my intuition after seeing the catalog (laughs).
How did you feel about using the Pile Navi Excavator?
Mr. Nitta: I had never used ICT construction machinery before, but I had experienced in surveying with the LN-150, so I did not get confused. When I first started using it, I used to inspect several times with the LN-150 after cutting the slope, but now I trust it because it has ensured a precision construction.
What are the benefits of introducing it?
Mr. Nitta: I think we have been able to reduce the number of man-hours for two people per day. There are undulations and curves in the mountainou areas, and in some places we had to hang the piles at 5m pitch. With the introduction of the "Layout-Navigator Excavator," the monitor shows the difference between the cutout position and the bucket cutting edge and the design surface, which not only reduced the number of times we had to hang the piles, but also eliminated the need to measure the construction surface, which was necessary the closer we got to the design surface.
For this time, we used the "Layout-Navigator Excavator" not only for the slope, but also for the road body. We scooped the slope while checking the height of the bucket cutting edge displayed on the monitor, and finished the work with a blade, it was quick. I would like to bring this with me to every job site.
I heard that you create 3D design data.
President Owada: To be honest, I had a very hard time at first. However, once you create the correct 3D design data, you can perform construction with the same accuracy no matter who does it, which leads to a reduction in man-hours on site. Even now, there are some hardships, but those hardships will be returned as money dozens of times by the end of the site.It would be a loss if you don't use 3D design data.

Please tell us about your future prospects.
President Owada: It has definitely led to an improvement in productivity, so I think it would be a good idea to introduce another pile navigation excavator. As a result, it would be nice to have two days off per week.
Interviewees
Username: Takashiba Construction Co., Ltd.
URL:https://www.takasiba-ono.com
Model used: 《Layout-Navigator Excavator》 3D-MG LPS Excavator X-M3x LN
Interview cooperation: Yamagata Sokki Co., Ltd.
URL:https://yamagata-sokkisha.jp
Case studies in the same industry
News
Events
- Start Date
- 2024/07/31
- End Date
- 2024/08/03
- Event Name
-
KOREA BUILD WEEK
- Event Details
-
-Date and time: 2024.7.31 (Wednesday) ~ 8.3 (Sat) 10:00 to 18:00 (Entrance deadline is 17:30)
-Admission fee
General : KRW 20,000
middle and high school students, group (10 or more) : KRW 10,000
※Free admission is available for pre-registration
※Other free admission targets: preschoolers, those aged 65 or older, persons with disabilities, Civil servants, soldiers, and people of national merit (requires verifiable ID, verification card)
- URL
- /content/topcon-pa/kr/en/events/2024/12345.html
- Target
- _self
- Start Date
- 2024/06/11
- End Date
- 2024/06/12
- Event Name
-
2024 TOPCON SOKKIA ICT User Conference
- Event Details
-
Date and time: 2024.06.11 (Tue) ~ 2024.06.12 (Wed) 10:00-17:00
Venue: COEX Conference Room (south) 317-318
Host : Topcon Sokia Positioning Korea
- URL
- /content/topcon-pa/kr/en/events/2024/0491.html
- Target
- _self