The structural safety management monitoring system Case Study

 NET1AXII

NET1AXⅡ/Changwon Gyeongryun Corporation/Jan.2018

Example of using the structural safety management monitoring system (NET1AXII)

SOKKIA

Surveying

Civil Engineering

Total Stations

Monitoring System

Infrastructure Maintenance

NET1AXⅡ/Changwon Gyeongryun Corporation/Jan.2018

Changwon Gyeongryun Corporation Introduces SOKKIA Monitoring System

Purpose of introduction

As part of the facility environment improvement project in 2014, the Changwon Racing Authority conducted the “DOME Monitoring System Construction Project” to prevent disasters due to collapse of stadium structures in advance, make decisions for post-maintenance management, and ensure the safety of use of structures. It was introduced to ensure smooth racing operation and facility management.

System configuration

This system is configured to precisely measure the displacement of the DOME structure using the automatic tracking Total Station NET1AXII, and then receive, correct, and analyze the measurement data in the central control room through communication (optical cable).

In addition, it is linked to the warning server, so when abnormal data is measured, warning messages can be confirmed through a horn, text message, or e-mail through wired or wireless functions.

 

Horn : Sound through PC speakers

Text/E-mail: Short text notification
and e-mail transmission using web hosting

system efficiency

This time, we asked Manager Choi Hyun-seok of DongA Surveying Instruments, who delivered the system, about the differences from conventional monitoring systems. “Instead of measuring sensors (strain gauge, deflection gauge, thermometer) and measuring equipment (static data logger) to be installed in each steel, we installed two automatic tracking measuring instruments and prisms (72) at the existing measuring locations to manage measurement. and we were able to significantly reduce costs” In addition, “I heard from a corporation representative that structural deformation and deflection phenomena can be monitored at all times and then collected and transmitted as spatial coordinate data, making management more convenient and efficient than the existing manual measurement method.” do. In addition, it is possible to periodically measure the deflection of the space frame supporting the structure, so it can be used as data to predict the behavior of the structure and confirm and judge the structural stability of the DOME structure from external weather changes and external forces.”

▶ Benefit

- Strengthening disaster prevention due to climate change and external forces

- Prevent disasters caused by DOME deformation in advance

- Decision-making for facility maintenance and ensuring the stability of use of the DOME structure

System configuration

DOME Monitoring System

Manager Choi Hyun-seok of DongA Surveying Instruments

Manager Choi Hyun-seok of DongA Surveying Instruments

Displacement measurement system

Displacement measurement system

Username: Changwon Gyeongryun Corporation
URL:https://www.domerace.com
Model used: NET1AXII      

Case studies in the same industry

  • TOPCON

    Civil Engineering

    Total Stations

    LN-100/KRIANGKRAI SURVEYING CO., LTD./Apr.2023

    Reduce 50 % of Work Time

    TOPCON

    Civil Engineering

    Total Stations

  • TOPCON

    Surveying

    Civil Engineering

    Building Construction

    Total Stations

    LN-150/Simgeum-a Construction Co., Ltd./Jul.2022

    Batter Board Survey of Factory Site Using LN-150

    TOPCON

    Surveying

    Civil Engineering

    Building Construction

    Total Stations

  • SOKKIA

    Surveying

    Civil Engineering

    Total Stations

    Monitoring System

    Infrastructure Maintenance

    NET1AXⅡ/Changwon Gyeongryun Corporation/Jan.2018

    Example of using the structural safety management monitoring system (NET1AXII)

    SOKKIA

    Surveying

    Civil Engineering

    Total Stations

    Monitoring System

    Infrastructure Maintenance

News

Events

Start Date
2024/10/24
End Date
2024/10/27
Event Details

-Venue: KINTEX Exhibition Hall 1 4 and 5

-Date and time: 2024.10.24 (Thu)~27 (Sun)

                           2024.10.24 (Thursday)~25 (Friday) 10:00~17:00

                           2024.10.27 (Sat)~28 (Sun) 10:00~16:00

-Admission fee: General 10,000 won (taxed on-site registration without prior registration or free invitation)

Tag
  • Building Construction
  • Physical
  • Free
URL
/content/topcon-pa/kr/en/topics/2024/20240919.html
Target
_self
Start Date
2024/07/31
End Date
2024/08/03
Event Details

-Date and time: 2024.7.31 (Wednesday) ~ 8.3 (Sat) 10:00 to 18:00 (Entrance deadline is 17:30)

-Admission fee

General : KRW 20,000

middle and high school students, group (10 or more) : KRW 10,000

※Free admission is available for pre-registration

※Other free admission targets: preschoolers, those aged 65 or older, persons with disabilities, Civil servants, soldiers, and people of national merit (requires verifiable ID, verification card)

Tag
  • Physical
  • Free
  • BIM CIM
  • Surveying Design
  • Exhibition
URL
/content/topcon-pa/kr/en/events/2024/12345.html
Target
_self
Start Date
2024/06/11
End Date
2024/06/12
Event Details

Date and time: 2024.06.11 (Tue) ~ 2024.06.12 (Wed) 10:00-17:00

Venue: COEX Conference Room (south) 317-318

Host : Topcon Sokia Positioning Korea

Tag
  • Exhibition
  • Construction Ict
  • Physical
URL
/content/topcon-pa/kr/en/events/2024/0491.html
Target
_self

Contact us