- Start Date
- 2024/11/05
- End Date
- 2024/11/07
- Event Name
-
12th MRC 2024 & 5th IRF Global Asia-Pacific Regional Congress
- Event Details
-
12th Malaysian Road Conference & Exhibition 2024 and 5th International Road Federation Global Asia-Pacific Regional Congress
Date: November 5-7 (Tue – Thu)
Venue: World Trade Centre Kuala Lumpur, Malaysia
Organizer: Road Engineering Association of Malaysia (REAM) & International Road Federation Global (IRF Global)
- URL
- https://www.12thmrc.com/
- Target
- _blank
MAGNET Field Layout
Guided Layout Field Software
Fast and accurate layout
Lay out more points per day for building construction
- Intuitive, graphical building-layout menus
- Fast creation of design points
- Vast library of compatible 2D, 3D and BIM file formats
- Hardware support for robotic total stations and scanning robotic total stations
- Includes field-to-office cloud connectivity via MAGNET Enterprise
Quick and confident point layout

This easy-to-use software is designed with building contractors in mind and packed with features that simplify layout and measuring applications. Easy set-up routines, a flexible interface, a simple code library, cloud connectivity and field-based point-creation add up to more points laid out per day to get the job done.
MAGNET Field Layout is compatible with our robotic total stations and GTL-1000 for layout and verification applications. It’s perfect for general construction or concrete, steel, mechanical, electrical and plumbing specialty trades.
Pair with Topcon Point Manager for a seamless office and field layout workflow
Adopt an improved digital layout workflow to increase efficiency, accuracy and reduce risk. Starting in the office, create points using Point Manager as a plug-in for Autodesk Revit® or AutoCAD® design software. Then upload directly to your tablet in the field for project layout. Later, upload deviation files from the field back to the office to update design models to match as-built conditions.
Simplified construction verification workflows
Our GTL scanning robotic total station solution helps you work more productively and confidently. Together with ClearEdge3D Verity, the simplified verification workflows cover a range of applications including documenting job site as-built conditions and performing construction verification to ensure project accuracy is built 100% to plan.

Brochure
Video
Topcon Point Manager
Related Item
News
What's New
Events
- Start Date
- 2024/10/22
- End Date
- 2024/10/24
- Event Name
-
BUILDXPO 2024
- Event Details
-
Malaysia International Building and Construction Industry Showcase
Date: October 22–24 (Tue – Thu)
Venue: Hall 2 & 3, MITEC (Malaysia International Trade and Exhibition Centre), Kuala Lumpur, Malaysia
Organizer: Ministry Of Works (KKR), Malaysia & Construction Industry Development Board (CIDB), Malaysia
- URL
- https://buildxpo.com.my/
- Target
- _blank
- Start Date
- 2024/09/25
- End Date
- 2024/09/29
- Event Name
-
VIETBUILD Hanoi 2024 – PHASE 3
- Event Details
-
INTERIOR & EXTERIOR DECORATION - ARCHITECTURE - REAL ESTATE & BUILDING MATERIALS
Date: September 25–29 (Wed – Sun)
Venue: National Exhibition Construction Center - 01 Do Duc Duc St., Nam Tu Liem Dist., Ha Noi City
Organizer: Vietbuild Construction International Exhibition Organization Corporation
- URL
- https://vietbuildexhibition.com.vn/en/exhibitions/vietbuild-hanoi-2024-3rd-time/
- Target
- _blank