Layout-Navigator excavator Case study

3D-MG LPS Excavator  X-M3x LN

Pile navigation excavator use case study

"Layout-Navigator Excavator" perfectly suits for the construction in maountain area!

TOPCON

Civil Engineering

Machine Control

Pile Navigation Excavator Case Study / Takashiba Construction Co., Ltd. / 2022.01

"Layout-Navigator Excavator" perfectly suits for the construction in maountain area!

The ideal ICT construction system that we finally came across

Takashiba Construction Co., Ltd. in Fukushima Prefecture is a construction company that focuses on construction work in mountain areas.

 

We heard that "Layout-Navigator Excavator" was introduced, and we had  an interview with Mr.Tsutomu Owada, the representative director, and Mr. Yasumichi Nitta, who is actually using it in the construction sites.

Please tell us how you introduced "Layout-Navigator Excavator".

President Owada: We often work on construction in mountain areas, and most of the sites are difficult to capture GNSS. That's why we have been investing in total stations and layout navigation systems and considering the introduction of a total station excavator system, but we had deferred a decision on purchase of the system because it was expensive. When I was looking for an inexpensive system,  "Layout-Navigator Excavator" was introduced. I knew how fast the layout navigation system would respond, so I felt that this is the timing, and I thought, "Let's purchase it right away!"

Did you participate in any test drive events?

President Owada: I didn't participate at all. I made purchase decision with my intuition after seeing the catalog (laughs).

How did you feel about using the Pile Navi Excavator?

Mr. Nitta: I had never used ICT construction machinery before, but I had experienced in surveying with the LN-150, so I did not get confused. When I first started using it, I used to inspect several times with the LN-150 after cutting the slope, but now I trust it because it has ensured a precision construction.

 

What are the benefits of introducing it?

Mr. Nitta: I think we have been able to reduce the number of man-hours for two people per day. There are undulations and curves in the mountainou areas, and in some places we had to hang the piles at 5m pitch.  With the introduction of the "Layout-Navigator Excavator," the monitor shows the difference between the cutout position and the bucket cutting edge and the design surface, which not only reduced the number of times we had to hang the piles, but also eliminated the need to measure the construction surface, which was necessary the closer we got to the design surface.

For this time, we used the "Layout-Navigator Excavator" not only for the slope, but also for the road body. We scooped the slope while checking the height of the bucket cutting edge displayed on the monitor, and finished the work with a blade, it was quick. I would like to bring this with me to every job site.

I heard that you create 3D design data.

President Owada: To be honest, I had a very hard time at first. However, once you create the correct 3D design data, you can perform construction with the same accuracy no matter who does it, which leads to a reduction in man-hours on site. Even now, there are some hardships, but those hardships will be returned as money dozens of times by the end of the site.It would be a loss if you don't use 3D design data.

I heard that 3D design data has also been created.

Please tell us about your future prospects.

President Owada: It has definitely led to an improvement in productivity, so I think it would be a good idea to introduce another pile navigation excavator. As a result, it would be nice to have two days off per week.

Interviewees

Representative Director

Tsutomu Owada

TOPCON

Civil Engineering

Machine Control

Tsutomu Owada

Username: Takashiba Construction Co., Ltd.

URL:https://www.takasiba-ono.com

Model used: 《Layout-Navigator Excavator》 3D-MG LPS Excavator X-M3x LN

 

Interview cooperation: Yamagata Sokki Co., Ltd.

URL:https://yamagata-sokkisha.jp

 

Case studies in the same industry

  • TOPCON

    Civil Engineering

    Machine Control

    Layout-Navigator excavator / Takashiba Construction Co., Ltd. / Jan.2022

    "Layout-Navigator Excavator" perfectly suits for the construction in maountain area!

    TOPCON

    Civil Engineering

    Machine Control

  • TOPCON

    Civil Engineering

    Machine Control

    ICT Construction Case Study / Kadonogumi Co., Ltd. / Apr.2020

    Improving safety, productivity, and quality with ICT technology! Kadonogumi Co., Ltd. in Fukuchiyama City, Kyoto Prefecture. It owns 35 backhoes, 3 dozers, and many other construction equipment, and has many achievements in earthwork, and has been awarded as an excellent construction performance company for five consecutive years in the first year of Reiwa.

    TOPCON

    Civil Engineering

    Machine Control

  • TOPCON

    Civil Engineering

    Machine Control

    3D-MC/Abe Kensetsu Co., Ltd./Nov.2016

    Taking Full Advantage of ICT-Integrated Construction Machinery!

    TOPCON

    Civil Engineering

    Machine Control

News

Events

Start Date
2024/11/05
End Date
2024/11/07
Event Details

12th Malaysian Road Conference & Exhibition 2024 and 5th International Road Federation Global Asia-Pacific Regional Congress

Date: November 5-7 (Tue – Thu)

Venue: World Trade Centre Kuala Lumpur, Malaysia

Organizer: Road Engineering Association of Malaysia (REAM) & International Road Federation Global (IRF Global)

 

Tag
  • Civil Engineering
  • Building Construction
  • Physical
  • Exhibition
URL
https://www.12thmrc.com/
Target
_blank
Start Date
2024/10/22
End Date
2024/10/24
Event Name

BUILDXPO 2024

Event Details

Malaysia International Building and Construction Industry Showcase

Date: October 22–24 (Tue – Thu)

Venue: Hall 2 & 3, MITEC (Malaysia International Trade and Exhibition Centre), Kuala Lumpur, Malaysia

Organizer: Ministry Of Works (KKR), Malaysia & Construction Industry Development Board (CIDB), Malaysia

 

Tag
  • Building Construction
  • Physical
  • Exhibition
URL
https://buildxpo.com.my/
Target
_blank
Start Date
2024/09/25
End Date
2024/09/29
Event Details

INTERIOR & EXTERIOR DECORATION - ARCHITECTURE - REAL ESTATE & BUILDING MATERIALS

Date: September 25–29 (Wed – Sun)

Venue: National Exhibition Construction Center - 01 Do Duc Duc St., Nam Tu Liem Dist., Ha Noi City

Organizer: Vietbuild Construction International Exhibition Organization Corporation

 

Tag
  • Building Construction
  • Physical
  • Exhibition
URL
https://vietbuildexhibition.com.vn/en/exhibitions/vietbuild-hanoi-2024-3rd-time/
Target
_blank

Contact us